Actions
Defect #11484
closedProblem with "Applied in changeset" comment
Status:
Closed
Priority:
Normal
Assignee:
-
Category:
Time tracking
Target version:
-
Start date:
Due date:
% Done:
0%
Estimated time:
Resolution:
Duplicate
Affected version:
Description
Hi!
I'm testing linking between commits from SVN and redmine.
I manged to get everything working except the fact that when I check "Spent time" section I see entry with comment "Applied in changeset r2568". It is just text, not a link and is rather useless.
Wouldn't it be easier to show there actual comment connected to revision which I entered which is "testowy commit3" in this case or at least link to URL/projects/PROJECT_NAME/repository/revisions/2568 ?
In my opinion would be both - comment I entered ( not an automatic one) + link to revision.
Files
Related issues
Updated by Ania K over 12 years ago
Forgot to set version of Redmine. I'm using 2.0.3.stable.10067
Updated by Jean-Philippe Lang over 12 years ago
- Category set to Time tracking
- Status changed from New to Closed
- Resolution set to Duplicate
Actions