Actions
Defect #3657
closedBad issue validation
Status:
Closed
Priority:
Normal
Assignee:
-
Category:
Issues
Target version:
-
Start date:
2009-07-23
Due date:
% Done:
0%
Estimated time:
Resolution:
Fixed
Affected version:
Description
Issue's tracker must be active on the project. This constraint is validated at issue's creation time only. This allow to save an issue without this constraint respected. This is possible directly with the interface by first creating an issue on a project where tracker A is active and then moving it to a project where tracker A is not active.
Here is a patch that validates this constraint when saving an issue.
Files
Updated by Jean-Philippe Lang about 15 years ago
- Status changed from New to Closed
- Resolution set to Fixed
Tracker validation is now done when creating or moving the issue (r3108).
Actions