| 4 | |||
| 5 | h2. Introduction |
||
| 6 | |||
| 7 | This page lists an overview of open issues which are speaking specifically about changing the done ratio (@% Done@) behavior in several ways. This list could be used while managing all the issue duplicates. |
||
| 8 | |||
| 9 | h2. Current options for "Calculate the issue done ratio with"-setting |
||
| 10 | |||
| 11 | # Use the issue field (option 1) |
||
| 12 | # Use the issue status (option 2) |
||
| 13 | |||
| 14 | h2. Issue list |
||
| 15 | |||
| 16 | h3. Implementation of existing "Use the issue status"-setting (option 2) |
||
| 17 | |||
| 18 | * Patch #4274: Use Issue status for percent done |
||
| 19 | ** Revision r3151[1], "added by Eric Davis over 3 years ago" |
||
| 20 | |||
| 21 | h3. Requests (and patch) for adding 3rd option "Use the logged and estimated time" |
||
| 22 | |||
| 23 | * Feature #952: Update % to be programatic not arbitrary |
||
| 24 | * Feature #3719: Automatical % Done regarding to Spent Time / Estimated Time |
||
| 25 | * Feature #7545: Calculate the issue done ratio |
||
| 26 | * Feature #7635: Edit % Done while logging time |
||
| 27 | * Feature #11999: Calculating issue done ratio based on "Estimated Time" and "Spent Time" - selectable by project (not globally) |
||
| 28 | * Feature #12347: "Calculate the issue done ratio" per project configuration |
||
| 29 | * Feature #12762: Add option to calculate done ratio with the data from time tracking |
||
| 30 | * Patch #13400: Calculate %done based on estimated and logged time |
||
| 31 | |||
| 32 | h3. Requests (and plugin) for adding 4th option "Use the issue status and field" |
||
| 33 | |||
| 34 | * Feature #6975: Autocalculate the issue done ratio only for certain issue status |
||
| 35 | ** "Redmine Issue Done Ratio Both plugin at GitHub":https://github.com/vaz/redmine_issue_done_ratio_both |
||
| 36 | * Feature #11809: update progress depending on status (just default value) |
||
| 37 | * Feature #11989: New Allow done ratios to be affected by status AND field |
||
| 38 | * Feature #12361: Mixed done ratio calculation mode |
||
| 39 | |||
| 40 | h3. Requests to be able to change done ratio via commit messages (ext. #1518 and #4155) |
||
| 41 | |||
| 42 | * Feature #7376: Allow percent done to be updated via VCS commit message |
||
| 43 | * Feature #9715: New Update issue done ratio from commit message |
||
| 44 | * Feature #12815: implement commit keyword to set or to increase issue done ratio of referenced ticket |
||
| 45 | |||
| 46 | h3. Requests to automatically change done ratio to 100% when an issue is closed (assigned closed marked status) |
||
| 47 | |||
| 48 | * Feature #1306: New resolution fixed and % done out of sync |
||
| 49 | * Feature #12868: status related to progress bar |
||
| 50 | |||
| 51 | |||
| 52 | fn1. Commit-msg of r3151: <pre>Adds a Setting to control how an Issue's done_ratio is calculated: |
||