DoneRatio issues overview » History » Revision 2
Revision 1 (Mischa The Evil, 2013-03-14 04:52) → Revision 2/13 (Joshua Judson Rosen, 2013-09-04 23:09)
h1. DoneRatio issues overview {{toc}} h2. Introduction This page lists an overview of open issues which are speaking specifically about changing the done ratio (@% Done@) behavior in several ways. This list could be used while managing all the issue duplicates. h2. Current options for "Calculate the issue done ratio with"-setting # Use the issue field (option 1) # Use the issue status (option 2) h2. Issue list h3. Implementation of existing "Use the issue status"-setting (option 2) * Patch #4274: Use Issue status for percent done ** Revision r3151[1], "added by Eric Davis over 3 years ago" h3. Requests (and patch) for adding 3rd option "Use the logged and estimated time" * Feature #952: Update % to be programatic not arbitrary * Feature #3719: Automatical % Done regarding to Spent Time / Estimated Time * Feature #7545: Calculate the issue done ratio * Feature #7635: Edit % Done while logging time * Feature #11999: Calculating issue done ratio based on "Estimated Time" and "Spent Time" - selectable by project (not globally) * Feature #12347: "Calculate the issue done ratio" per project configuration * Feature #12762: Add option to calculate done ratio with the data from time tracking * Patch #13400: Calculate %done based on estimated and logged time h3. Requests (and plugin) for adding 4th option "Use the issue status and field" * Feature #6975: Autocalculate the issue done ratio only for certain issue status ** "Redmine Issue Done Ratio Both plugin at GitHub":https://github.com/vaz/redmine_issue_done_ratio_both * Feature #11809: update progress depending on status (just default value) * Feature #11989: New Allow done ratios to be affected by status AND field * Feature #12361: Mixed done ratio calculation mode * Defect #6609: % Done for Parent Tasks [2] h3. Requests to be able to change done ratio via commit messages (ext. #1518 and #4155) * Feature #7376: Allow percent done to be updated via VCS commit message * Feature #9715: New Update issue done ratio from commit message * Feature #12815: implement commit keyword to set or to increase issue done ratio of referenced ticket h3. Requests to automatically change done ratio to 100% when an issue is closed (assigned closed marked status) * Feature #1306: New resolution fixed and % done out of sync * Feature #12868: status related to progress bar fn1. Commit-msg of r3151: <pre>Adds a Setting to control how an Issue's done_ratio is calculated: • Issue field (default) - the done_ratio field for the Issue • Issue status - uses the Issue Status's value #4274</pre>