Actions
Patch #3229
closedpatch for (global level, png format) gantt export problem on 0.8 branch
Start date:
2009-04-23
Due date:
% Done:
0%
Estimated time:
Description
same bug on trunk is fixed by r2332. but I think we need backport patch to 0.8 branch. (because I use it, maybe not only me.)
slightly different way, I use a new variable named basename. because there are two of same routine (that checking project.nil), it brings mistake/missing.
please check the patch. thanks.
Files
Actions