Defect #7457
closedProgressbar in Roadmap does not work correct.
Status:
Closed
Priority:
Normal
Assignee:
-
Category:
Roadmap
Target version:
-
Start date:
2011-01-26
Due date:
% Done:
0%
Estimated time:
Resolution:
Cant reproduce
Affected version:
Description
If one or more ticket open then the progress is 0%.
When all tickets are closed the progress is right on 100%.
But between it is always 0%. (See screenshot)
I've tried with percentage and status calculation in the setting.
Files
Updated by Dmitry Babenko about 12 years ago
Never noticed such behavior running several Redmine installations since version 1.0.
Reinhard Hiebl should provide more details (e.g. steps to reproduce) or this defect may be closed.
Updated by Jean-Philippe Lang about 12 years ago
- Status changed from New to Closed
- Resolution set to Cant reproduce
Indeed.
Updated by debao zhang about 8 years ago
Hi, I have exactly the same problem. The progress is always 0%
My redmine install on a Ubuntu 16.04 server through apt-get install
Environment: Redmine version 3.2.1.stable Ruby version 2.3.1-p112 (2016-04-26) [x86_64-linux-gnu] Rails version 4.2.6 Environment production Database adapter Mysql2 SCM: Git 2.7.4 Filesystem Redmine plugins: a_common_libs 2.1.10 clipboard_image_paste 1.10 easy_gantt 1.7 easy_wbs 2016-0.0 redmine_agile 1.4.1 redmine_checklists 3.1.5 redmine_ckeditor 1.1.4 redmine_dmsf 1.5.6 redmine_favorite_projects 2.0.3 redmine_issue_tabs 1.1.1 redmine_issue_templates 0.1.3 redmine_people 1.2.0 redmine_questions 0.0.7 redmine_wiki_extensions 0.7.0 redmine_work_time 0.3.3 scrum 0.15.0 usability 2.1.4
Updated by Toshi MARUYAMA about 8 years ago