Progressbar in Roadmap does not work correct.
Added by Reinhard Hiebl almost 14 years ago.
Updated about 8 years ago.
Resolution:
Cant reproduce
Description
If one or more ticket open then the progress is 0%.
When all tickets are closed the progress is right on 100%.
But between it is always 0%. (See screenshot)
I've tried with percentage and status calculation in the setting.
Files
Never noticed such behavior running several Redmine installations since version 1.0.
Reinhard Hiebl should provide more details (e.g. steps to reproduce) or this defect may be closed.
- Status changed from New to Closed
- Resolution set to Cant reproduce
Hi, I have exactly the same problem. The progress is always 0%
My redmine install on a Ubuntu 16.04 server through apt-get install
Environment:
Redmine version 3.2.1.stable
Ruby version 2.3.1-p112 (2016-04-26) [x86_64-linux-gnu]
Rails version 4.2.6
Environment production
Database adapter Mysql2
SCM:
Git 2.7.4
Filesystem
Redmine plugins:
a_common_libs 2.1.10
clipboard_image_paste 1.10
easy_gantt 1.7
easy_wbs 2016-0.0
redmine_agile 1.4.1
redmine_checklists 3.1.5
redmine_ckeditor 1.1.4
redmine_dmsf 1.5.6
redmine_favorite_projects 2.0.3
redmine_issue_tabs 1.1.1
redmine_issue_templates 0.1.3
redmine_people 1.2.0
redmine_questions 0.0.7
redmine_wiki_extensions 0.7.0
redmine_work_time 0.3.3
scrum 0.15.0
usability 2.1.4
debao zhang wrote:
[...]
Do not post old closed issue.
If you have problem in more recent version (e.g. 3.2.4 or 3.3.1) without plugins, please create new issue with more details (e.g. steps to reproduce).