h1. DoneRatio issues overview
2
3
{{toc}}
4
5
h2. Introduction
6
7
This page lists an overview of open issues which are speaking specifically about changing the done ratio (@% Done@) behavior in several ways. This list could be used while managing all the issue duplicates.
8
9
h2. Current options for "Calculate the issue done ratio with"-setting
10
11
# Use the issue field (option 1)
12
# Use the issue status (option 2)
13
 
14
h2. Issue list
15
16
h3. Implementation of existing "Use the issue status"-setting (option 2)
17
18
* Patch #4274: Use Issue status for percent done
19
** Revision r3151[1], "added by Eric Davis over 3 years ago"
20
21 9 Mischa The Evil
h3. Requests (and patches) for adding 3rd option "Use the logged and estimated time"
22 1 Mischa The Evil
23
* Feature #952: Update % to be programatic not arbitrary
24
* Feature #3719: Automatical % Done regarding to Spent Time / Estimated Time
25
* Feature #7545: Calculate the issue done ratio
26
* Feature #7635: Edit % Done while logging time
27
* Feature #11999: Calculating issue done ratio based on "Estimated Time" and "Spent Time" - selectable by project (not globally)
28
* Feature #12347: "Calculate the issue done ratio" per project configuration
29
* Feature #12762: Add option to calculate done ratio with the data from time tracking
30
* Patch #13400: Calculate %done based on estimated and logged time
31 4 Mischa The Evil
* Feature #24277: Introducing Remaining Time field as method to track the remaining time to complete an issue
32 1 Mischa The Evil
33
h3. Requests (and plugin) for adding 4th option "Use the issue status and field"
34
35
* Feature #6975: Autocalculate the issue done ratio only for certain issue status
36
** "Redmine Issue Done Ratio Both plugin at GitHub":https://github.com/vaz/redmine_issue_done_ratio_both
37
* Feature #11809: update progress depending on status (just default value)
38
* Feature #11989: New Allow done ratios to be affected by status AND field
39
* Feature #12361: Mixed done ratio calculation mode
40 6 Mischa The Evil
* Feature #20398: Use the issues field AND the issues status for issue done ratio
41 5 Mischa The Evil
42 8 Mischa The Evil
h3. Request for adding a fix for parent task done ratio calculation when "Use the issue field"-setting (option 1) is used
43
44
* Defect #21449: Automatic done ratio calculation in issue tree is wrong when parent has its own estimated time
45
46 5 Mischa The Evil
h3. Request for adding a fix for parent task done ratio calculation when "Use the issue status"-setting (option 2) is used
47
48
* Defect #6609: % Done for Parent Tasks [2]
49 1 Mischa The Evil
50
h3. Requests to be able to change done ratio via commit messages (ext. #1518 and #4155)
51
52
* Feature #7376: Allow percent done to be updated via VCS commit message
53
* Feature #9715: New Update issue done ratio from commit message 
54
* Feature #12815: implement commit keyword to set or to increase issue done ratio of referenced ticket
55
56
h3. Requests to automatically change done ratio to 100% when an issue is closed (assigned closed marked status)
57
58
* Feature #1306: New resolution fixed and % done out of sync
59
* Feature #12868: status related to progress bar
60 7 Mischa The Evil
* Feature #33894: Automatically set done ratio to 100% when closing a issue
61 1 Mischa The Evil
62
fn1. Commit-msg of r3151: <pre>Adds a Setting to control how an Issue's done_ratio is calculated:
63
• Issue field (default) - the done_ratio field for the Issue
64
• Issue status - uses the Issue Status's value 
65
#4274</pre>