RedmineRoadmap » History » Revision 13
Revision 12 (Mischa The Evil, 2009-03-31 00:06) → Revision 13/19 (Mischa The Evil, 2009-03-31 00:40)
h1. Roadmap The roadmap provides a highly-configurable, version-based view on the issue tracking system that helps planning and managing the development of a project. It also provides an in-depth (version-based) overview of the current state of your project. h2. Overview If you select the Roadmap you will get an overview of the current state of your project, like the following: !roadmap-default.jpg! The above mentioned view contains the following "blocks" of information for all (incomplete) versions: * a progressbar There you can select which indicates overall active/done/closed-ratio based on the %-done and statuses of the issues targetted to the corresponding version, visualized by different colour-gradients are open and including the date the version has been scheduled to be complete the content of the wiki-page that has been configured to be attached to the version * if configured: the content of the wiki-page that has been configured to be attached to the version (see below) * if configured: which are closed. If you are interested into a detailed list of all the issues assigned to the specific version (see below) The mentioned progressbar includes drill-down links to the issue-list which preloads the specific filters thus providing quick links to open/closed issues targetted to a corresponding version. Simply are not solved you can simply click on to the number left to *_open_* to see all open issues in the issue-list. If *_open_*, but if you like to know which issues are already solved/closed solved simply click on the number left to *_closed_*. The green bar will indicate how far you away from finishing your milestone (99%). If you click on the version itself (0.8 right from the !/images/package.png!-icon) !/images/package.png!) you can get a detailed view of the current, overall state of a specific version. This is the [[RedmineVersion|version-view]]. h2. Managing the Roadmap If you have the appropriate permissions you You can change the Roadmap-view configuration in two ways: # You can attach a wikipage to the version (see [[RedmineProjectSettings#Versions]]) which can be used for describing main objectives of the version etc. # You can select the trackers of which individual issues, which are targetted to the corresponding version, are listed in a that way that you will see an area with all related issues directly under the version. milestone. This behaviour can be changed as an administrator in the area of the [[RedmineIssueTrackingSetup#Trackers|trackers]]. h2. Sidebar The contextual sidebar on the right of the roadmap provides several things: * a checkbox to include completed target-versions on the roadmap * checkboxes and an apply-button to include/exclude issues from specific trackers on the roadmap (which trackers are shown here with checkboxes depends on the individual [[RedmineIssueTrackingSetup#Trackers|tracker-configuration]]) * links to the configured target-versions of the project where each links to the roadmap itself starting with the selected target-version