make an existing issue subtask of another issue
Added by Andreas Deininger over 14 years ago
Hi,
if I have two issues, say #23 and #87 (both top level issues), is it possible to move #87 so that it becomes a subtask of #23? I haven't found a way to do so yet.
Thanks in advance
Andreas
I think this is possible through the "more" link (see RedmineIssues) that at least on our install has a field to set a parent issue.