Actions
Patch #251
openPatch for Feature Request #9785 (Default issues due date == assigned target version date)
Status:
New
Priority:
Normal
Assignee:
-
Category:
-
Target version:
-
Start date:
Due date:
% Done:
0%
Estimated time:
Description
This patch makes it so that if a new issue is assigned to a version, but the end date isn't specified, the end date
is automatically filled in with the end date of the version.
(I hope the diff is in the right format, I've never really done this before)
Files
Related issues
Actions