DoneRatio issues overview

Introduction

This page lists an overview of open issues which are speaking specifically about changing the done ratio (% Done) behavior in several ways. This list could be used while managing all the issue duplicates.

Current options for "Calculate the issue done ratio with"-setting

  1. Use the issue field (option 1)
  2. Use the issue status (option 2)

Issue list

Implementation of existing "Use the issue status"-setting (option 2)

  • Patch #4274: Use Issue status for percent done
    • Revision r31511, "added by Eric Davis over 3 years ago"

Requests (and patches) for adding 3rd option "Use the logged and estimated time"

  • Feature #952: Update % to be programatic not arbitrary
  • Feature #3719: Automatical % Done regarding to Spent Time / Estimated Time
  • Feature #7545: Calculate the issue done ratio
  • Feature #7635: Edit % Done while logging time
  • Feature #11999: Calculating issue done ratio based on "Estimated Time" and "Spent Time" - selectable by project (not globally)
  • Feature #12762: Add option to calculate done ratio with the data from time tracking
  • Patch #13400: Calculate %done based on estimated and logged time
  • Feature #24277: Introducing Remaining Time field as method to track the remaining time to complete an issue

Requests (and plugin) for adding 4th option "Use the issue status and field"

  • Feature #6975: Autocalculate the issue done ratio only for certain issue status
  • Feature #11809: update progress depending on status (just default value)
  • Feature #11989: New Allow done ratios to be affected by status AND field
  • Feature #12361: Mixed done ratio calculation mode
  • Feature #20398: Use the issues field AND the issues status for issue done ratio

Requests to turn the application setting "Calculate the issue done ratio with" into a project setting

  • Feature #11999: Calculating issue done ratio based on "Estimated Time" and "Spent Time" - selectable by project (not globally)
  • Feature #12347: "Calculate the issue done ratio" per project configuration

Request for adding a fix for parent task done ratio calculation when "Use the issue field"-setting (option 1) is used

  • Defect #21449: Automatic done ratio calculation in issue tree is wrong when parent has its own estimated time

Request for adding a fix for parent task done ratio calculation when "Use the issue status"-setting (option 2) is used

  • Defect #6609: % Done for Parent Tasks [2]

Requests to be able to change done ratio via commit messages (ext. #1518 and #4155)

  • Feature #7376: Allow percent done to be updated via VCS commit message
  • Feature #9715: New Update issue done ratio from commit message
  • Feature #12815: implement commit keyword to set or to increase issue done ratio of referenced ticket

Requests to automatically change done ratio to 100% when an issue is closed (assigned closed marked status)

  • Feature #1306: New resolution fixed and % done out of sync
  • Feature #12868: status related to progress bar
  • Feature #33894: Automatically set done ratio to 100% when closing a issue

1 Commit-msg of r3151:

Adds a Setting to control how an Issue's done_ratio is calculated:
• Issue field (default) - the done_ratio field for the Issue
• Issue status - uses the Issue Status's value 
#4274

Updated by Mischa The Evil over 3 years ago · 11 revisions